All transformers are tested in compliance with IEC 60076-1
Routine tests
Below the list of routine tests to be performed on liquid immersed transformers:
- Measurement of winding resistance
- Measurement of voltage ratio
- Checking of phase displacement
- Measurement of short-circuit impedance and load loss
- Measurement of no-load loss and current
- Dielectric routine tests (please check below according to the Um (IEC 60076-3))
- Insulation test and functional verification of accessories
- Tests on on-load tap changers, where appropriate
- Auxiliary wiring insulation test
- Leak testing with pressure (tightness test)
- Tightness tests and pressure tests for tanks for gas-filled transformers
- Check of the ratio and polarity of built-in transformers
- Check of core and frame insulation for liquid immersed transformers with core or frame insulation
Additional routine tests for transformers with Um >75 kV
- Determination of capacitances windings-to-earth and between windings
- Measurement of DC insulation resistance between each winding to earth and between windings
- Measurement of dissipation factor (tan δ) of the insulation system capacitances
- Measurement of dissolved gases in dielectric liquid from each separate oil compartment except diverter switch compartment
- Measurement of no-load loss and current at 90% and 110% of rated voltage
Type tests
Below the list of type tests that can be performed on liquid immersed transformers:
- Temperature rise type test (IEC 60076-2)
- Dielectric type tests (IEC 60076-3)
- Determination of sound level (IEC 60076-10) for each method of cooling for which a guaranteed sound level is specified
- Measurement of the power taken by the fan and liquid pump motors
- Measurement of no-load loss and current at 90% and 110% of rated voltage
Special tests
Below the list of special tests that can be performed on liquid Iimmersed ransformers directly in SEA or in our associated laboratories:
- Dielectric special tests (IEC 60076-3)
- Winding hot-spot temperature-rise measurements
- Determination of capacitances windings-to-earth and between windings
- Measurement of dissipation factor (tan δ) of the insulation system capacitances
- Determination of transient voltage transfer characteristics
- Measurement of zero-sequence impedance(s) on three phase transformers
- Short-circuit withstand test
- Measurement of DC insulation resistance between each winding to earth and between windings
- Vacuum deflection test on liquid immersed transformers
- Pressure deflection test on liquid immersed transformers
- Vacuum tightness test on site on liquid immersed transformers
- Measurement of frequency response (Frequency Response Analysis or FRA); the test procedure shall be agreed between manufacturer and purchaser
- Check of external coating (ISO 2178 and ISO 2409 or as specified)
- Measurement of dissolved gasses in dielectric liquid
- Mechanical test or assessment of tank for suitability for transport (to customer specification)
- Determination of weight with transformer arranged for transport. For transformers up to 1,6 MVA by measurement; for larger transformers by measurement or calculation as agreed between manufacturer and purchaser
- Detection of harmonic content in no load current
- Thermographic detection of hot-spots
- Measurement of winding inductance
- Recurrent voltage surges test
- In-rush current test
- Measurement of the transmitted vibrations
- Test on vibration floor (seismic)
Other tests requirements for specific transformers are specified in IEC 60076-3.
The type and/or special tests that can be carried out on the transformers are always listed separately both in phase of offer and/or order.