SEA SpA has recently supplied three transformer rectifier units 12 pulse, with secondary current (for each arm) of 6351 A.
The functioning of the High Current Rectifier System before the installation onsite has been tested in our testing laboratory.
This test allows to analyze the functionality of the complete equipment (transformer + AC connection + rectifier) before delivery. It is also possible to simulate, accurately, the performance of such high-power system, including the power transformer, power electronic parts, the cables, busbars all together. And the good news is that all in multi physics environment, considering the electrical, mechanical, and thermal effects.